PRESS RELEASE Power Generation

Florida’s Halifax Health relies on standby power system from mtu Onsite Energy for new 10-story emergency facility

Posted on October 20, 2009

Halifax Health officials sized the new 4.5 MW mtu Onsite Energy power system to supply all the loads in the new tower, including HVAC. Having a reliable standby power system is not only required by code, but is necessary as a practical matter, because east central Florida is hit frequently by hurricanes and thunderstorms that cause disruptions in grid power.

Images [1 Files, 21 KB]

Click here to download the article.